State health officials documented 16 separate control measure deficiencies in an inspection performed last month at the site of the ongoing road improvement project on Colo. 119 in Boulder Canyon.

The Colorado Department of Public Health and Environment Water Quality Control Division conducted a construction stormwater inspection Sept. 18, prompted by a complaint over erosion control concerns filed by the environmental advocacy group, Boulder Waterkeeper.

photo by Cliff Grassmick/Staff Photographer

Construction and traffic delays continue in Boulder Canyon on Tuesday.

On Sept. 20, state health officials told Longmont-based contractor Zak Dirt the inspection had identified a number of “corrective actions” which needed to be addressed immediately.



Source link